LATEST NEWS
20th July 2009
We have today achieved
ISO9001 accreditation
This helps strengthen our
position as a leading cover manufacturer.
SOUTHERN
WATER ASHFORD
2 Beam and Infill covers
have been ordered for sludge reception tanks
Work on site is due to
commence in April 2009
THAMES WATER BECKTON
Following the redesign of
our beam and the ability to span up to 25 metres totally self supporting we
secured the order to cover four 24 metre diameter sludge tanks.
The project requirements are
to design covers that can accommodate the picket fence thickener with out
fouling on the underside of the cover and design a suitable sealing arrangement
around the central drive shaft.
MEOLS Contract
COMPLETED on BUDGET and on TIME

An order to cover
two primary settlement tanks at MEOLS Waste Water Treatment Works will mean
relief from the odd whiff emanating from the tanks.

cover length 72
metres x 32 metres
That's
quite large
THAMES WATER MOGDEN
The contract to Cover
the Inlet Works
and Aeration lanes has
been placed
The work involves a
high proportion of specialist design to meet the exacting specification.
We are pleased to be
working once again with BIRSE Water who selected us on the basis they knew that
Corporate can undertake complicated designs and deliver on time and at the
quoted price.
WESSEX WATER POOLE
Following the
successful installation of the Hybrid covers at Bridport we have been awarded
orders to cover a fourth new tank at Bridport and two new build tanks at Poole
in Dorset.
WESSEX WATER
BRIDPORT
We are pleased to
announce a second contract for our unique hybrid fabric covers for Bridport.
Due to increased
demand on the works a fourth SBR tank is to be constructed.
We are pleased to
say that the site operations staff are pleased with the ease of opening and the
fabric covers do not hold water (ponding).
SOUTHERN WATER
We have recently completed a contract on
the south coast to
cover 4 aeration lanes and a sludge
buffer tank.
Areas on the cover have designated
walkways
enabling operators safe access onto the
covers.
Aeration Lane 1 of
4 SAS Buffer
tank
CETEC PROJECTS THE PUBLIC WEST BROMWICH
We received our
first major architectural order from CETEC Projects to carry out the manufacture
of GRP PODS to form work and office modules on a prestigious Arts centre in West
Bromwich. The order which is in excess of £300k required moulding to to the
highest possible standard.

WESSEX WATER BRIDPORT
Wessex Water site staff were having
problems with covers fitted on a
previous contract that did not
afford easy access to equipment below the
covers.
We were called into put forward
suggestion on how to best solve the problem.
after many meetings with operations
we put forward a NEW DESIGN
cover utilising our standard Beam & Infill system with a retractable
FABRIC section of cover.
A critical design statement was the
fabric covers needed to be operated by a single person both when opening and
closing, also unlike other fabric covers we had to come up with a design that
did not crab in operation.
Below are pictures of the 3 tanks
covered.
SPEAK TO COLIN OR DAVID FOR MORE
INFORMATION
.JPG)
.JPG)
UNITED
UTILITIES LIVERPOOL
Following on from
Phase 2 at Liverpool Sandon Dock Waste Water Treatment Works a further order to
provide GRP covers to a complete
Actiflo® plant.
The covers will
consist of both fixed and sliding covers giving operators access for cleaning
and maintenance.

1/2 MILLION POUND
CONTRACT COMPLETED
A major project
has been completed at United Utilities
Liverpool Sandon Dock Waste Water Treatment Works. Working for BIRSE WATER the design,
manufacture and fitting of odour control covers to the works main inlet and all
remaining channels and chambers was completed on time.

UNITED
UTILITIES DAVYHULME MANCHESTER
Contract awarded
to design, manufacture and fit Covers to inlet works and aeration lanes at United Utilities
DAVYHULME Waste Water Treatment Works.
For the second
year running we will be working for BIRSE WATER on this prestigious project to improve air quality
in the Trafford Area of Manchester
UNITED
UTILITIES HUNTINGTON
Contract awarded
by NORWEST HOLST to
design, manufacture and fit a GRP cover to a 51 metre x 10 metre Filter Gallery
for United Utilities
Huntington Water Treatment Works


Press Releases![[Under Construction]](images/undercon.gif)